by Becky Stansfield | Mar 17, 2026
HIKURANGI PRIMARY SCHOOL NEW ADMIN Mandeno Design was engaged by Hikurangi School BoT to masterplan for a replacement administration block, which had been affected by several floods due to its location within a flood zone. Following careful assessment, a new...
by Becky Stansfield | Mar 12, 2026
TAKAPUNA GRAMMAR SCHOOL NEW SCIENCE BLOCK COMMENCEMENT OF DESIGN TO BUILDING OCCUPANCY IN UNDER 8 MONTHS. Tendered as an off-site manufactured design and build project, the builder Construction Management Group (CMG) saved the Ministry of Education over $70k by...
by Becky Stansfield | Mar 12, 2026
MANAIA HOUSE Mandeno Design worked closely with the Northland District Health Board and all other involved stakeholders to thoroughly understand and gather the requirements for the intended outcome, ensuring the brief was met for transforming the existing 50-year-old...
by Becky Stansfield | Mar 12, 2026
ABOVE THE BREAK At the initial site meeting, the clients posed a simple but telling question: “Do you even think we can build on this?” The answer lay in embracing the site rather than resisting it. Set on a steep waterfront hillside, the property enjoys uninterrupted...
Recent Comments